Alternatively, the title could be, ‘A Lot of Snow’. My eleventh entry for ABS Builder Challenge. This build was basically two days of nearly non-stop building; one to build the bridge, sleigh, and water/underwater section, and one to make all of the snow and finishing details such as the trees. The dark red seed part is used 8 times in the sleigh.
Wow! Awesome job John! This is definitely worth the 2 days it took to build, the bridge is great, very well done, keep it up!!!! 😀
Wow! I love this build! 😀 Snowscape is awesome 🙂